Navigation | Site Search | Content
District Projects »
Utility Maintenance Program

Management of the complex infrastructure for the District requires a plan for routine utility maintenance.  The current maintenance program includes:

Wells

  • Depending on available funds, one or two well casings are cleaned each year.
  • Well master meters are calibrated annually.
  • Well motor control cabinets are inspected and examined by infrared for poor joints, weak fuses, bad insulation, etc.

Booster Pumps

  • Booster pumps are lubricated twice a year.

Pressure Reducing Stations
  • Pressure reducing stations are rebuilt every 4 years.

Disinfecting Equipment
  • Disinfection agent feeding equipment is rebuilt twice a year.

Tanks

  • Tanks are inspected annually.

© 2012 Eldorado Area Water and Sanitation District
[ phone: (505) 466-2411 ] [ Contact EAWSD via Email ] [ Contact Website Coordinator via Email ]
[ Privacy Policy ] [ Subscribe or Unsubscribe from our Email List ]